Opportunities

FY27 Holiday Decorations

Combined Synopsis/Solicitation from Veterans Affairs, Department of, solicitation 36C24827Q0122. Responses due Nov 18, 2026. NAICS 561790, Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14). Listed on SAM.gov.

Solicitation
36C24827Q0122
Notice type
Combined Synopsis/Solicitation
Department
Veterans Affairs, Department of
Agency
Veterans Affairs, Department of
Office
248-network Contract Office 8 (36c248)
Posted
Nov 13, 2026
Responses due
Nov 18, 2026
Product/service code
S208
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of performance
Tampa, FL
Listed on
SAM.gov

Description

HOLIDAY DECORATIONS; FURNISH, INSTALL AND REMOVE 1. General: The James A. Haley Veterans Administration Medical Center (JAHVH) requires the design, furnishing, delivery, installation, maintenance, and removal of holiday decorations for the 2026 holiday season at the main campus and six (6) off-site locations. 2. Scope: The Contractor shall provide all holiday décor, equipment, materials, labor, supervision, project management, transportation, and other resources necessary to design, procure, order, ship, deliver, install, maintain, and remove holiday decorations through final acceptance by the Government Point of Contact (POC). Holiday decorations shall include, at a minimum, UL-approved Christmas trees, decorative lighting, bows, garland, Christmas tree ornaments, and other related seasonal décor. The Contractor shall be responsible for coordinating and managing all aspects of the project, including scheduling, logistics, delivery, installation, maintenance during the display period, and removal of decorations.. All work shall be performed in accordance with applicable Federal, State, and local laws, regulations, codes, and ordinances, as well as all terms, conditions, provisions, schedules, and specifications contained herein. The Contractor shall ensure that all materials, equipment, and installation methods comply with applicable safety standards and manufacturer recommendations. The Contractor shall remain responsible for the satisfactory performance of all work until final inspection and acceptance by the Government POC.

Loading the opportunity